FM/UL Galvanized/ Black/ BMI/ Gi Malleable Iron Threaded Equal/Reducing Tee Pipe Fitting for Plumbing, Water, Gas or HVAC Systems, Fire Fighting System

Still deciding? Get samples of $ !
Order Sample

Product Description

Pipe Fitting System Banner
📋

Basic Information

Model NO.
130
Head Code
Round
Thread Distribution
Internal Thread
Surface
Polish
Material
Iron
Technics
Casting
Warranty
10 Years
Pressure
Low Pressure
Thread Types
NPT or BSPT
Standard
En10242/DIN2950/ISO228
🏢

About Our Manufacturing

We are a leading integrated manufacturer in the pipeline industry, operating four specialized production facilities focusing on Malleable Iron & Grooved Pipe Fittings, Valve Manufacturing, Steel Pipe Production, and Carbon Steel & Stainless Steel Pipe Fittings and Flanges.

All major product lines are FM Approved and UL Listed, meeting stringent international safety standards. With strong manufacturing capacity and centralized supply coordination, we provide flexible delivery schedules tailored to both standard and time-critical projects. Our products have been successfully installed in landmark projects such as Beijing Daxing International Airport and various global hospital and municipal projects.
Certification Strip
⚙️

Technical Specifications

Size1/8'' - 6''
MaterialMalleable Iron
StandardsISO 5922/ISO 049/ISO 7-1, ISO 228/EN 10242, ANSI/ASME B16.3
CertificatesFM / UL / CE / ABNT / SNI / TSE / ISI
Surface TreatmentNature Black / Hot Dip Galvanized / Electro Galvanized
Working PressurePN25 / 2.5Mpa / 363PSI / Class 150
Max Temperature200°C (392°F)
Tensile Strength≥350MPA
Product Detail
🏭

Factory Production & Process

Factory Overview
📦

Packaging & Delivery

Package Size
48.50cm * 32.00cm * 18.00cm
Gross Weight
20.000kg
Packing Method
Carton + Pallet
Logistics Support

Frequently Asked Questions

Are your products compliant with international certifications like UL or FM?
Yes, our fire protection products are UL/FM certified, and our pipes and valves hold CE-PED certifications. We can also provide regional certifications like SASO or GOST upon request.
Do you provide third-party test reports?
Absolutely. Each shipment includes factory inspection reports (material composition, pressure test data) and original certifications (ISO 9001, lab accreditation).
Is your packaging suitable for long-distance sea shipping?
We use a 3-level protective system: Anti-rust vacuum sealing, reinforced moisture-proof wooden crates with steel strapping, and container desiccants to ensure safety in extreme climates.
What Incoterms do you support?
We offer flexible options including EXW (factory pickup), FOB (major Chinese ports), and CIF/DDP door-to-door solutions through our preferred freight partners.
What is the typical production timeline?
Standard products usually take 15-20 days after order confirmation. Customized products require 25-30 days subject to drawing approval.
What clearance documents are provided?
Each shipment includes a Commercial Invoice, Packing List, Certificate of Origin (CO/Form F), and a Material Test Certificate (MTC).

Related Products